What We Do

Services

Here's the full rundown of what we build, fix, and finish.

Home › Services

Everything we take on

Every job below is one we do ourselves across Wheeling.

Deck Installation

We frame new decks on concrete footings poured below the Illinois frost line, usually around 42 inches down, so the structure doesn't heave when the ground freezes. Framing is pressure-treated lumber with joist hangers and hot-dip galvanized or stainless fasteners. We'll walk you through decking material before any concrete gets poured, since that choice affects joist spacing.

Deck Repair

A deck that bounces in the middle usually means a joist has rotted or a beam has shifted off its post. We pull up the boards around the problem spot, check how far the rot has spread, and sister new lumber to the old joist or replace it outright. Small repairs like a loose stair stringer or a popped fastener we can usually turn around in a day.

Deck Staining & Sealing

Gray, weathered wood gets stripped and sanded before any stain goes on, because sealing over dirt and old finish just means it peels again next spring. We use a penetrating oil-based stain on pressure-treated and cedar decks, not a film-forming paint that cracks and flakes. Plan on redoing this every two to three years depending on sun exposure.

Custom Deck Design

Multi-level layouts, built-in benches, pergolas, and curved rail sections all start as a sketch we walk through with you before any lumber gets ordered. We design around what your yard actually does with drainage and sun, not a stock plan. If your lot slopes toward the house, that changes where the footings go and how tall the first level sits.

Composite Decking

Composite boards don't need staining and they won't splinter, but they cost more up front and the framing underneath still has to be pressure-treated lumber. We install hidden fastener systems on most composite jobs so you don't see screw heads across the whole deck. Board spacing still matters for drainage even though composite doesn't absorb water the way wood does.

Deck Railing Installation

Guard rails need to sit between 36 and 42 inches depending on local code, and balusters have to be spaced so a 4-inch sphere can't pass through. We build rail systems in wood, metal baluster, or cable, and we check the spacing against code before it ever gets inspected. A loose or wobbly railing is one of the most common things we get called out to fix.

Deck Resurfacing

If the frame is still solid but the decking boards are cupped, splintered, or just the wrong color, we can strip the old boards and lay new ones on the existing structure. This costs less than a full rebuild, but only works if the joists pass inspection first. We won't resurface over a frame we wouldn't trust for another ten years.

Screened Porch & Deck Combos

Some decks get a screened section built in, usually over part of the structure, to get a bug-free spot without the cost of a full enclosure. This calls for extra framing for the roof load and a different foundation plan than an open deck. We can build this as part of a new deck or add it onto one we built years ago.

Deck Demolition & Removal

Old decks sometimes aren't worth saving, especially if the ledger board has rotted through or the footings were never set to code. We tear out the structure, haul off the lumber, and check what's behind the ledger on the house itself before anything new goes up. This usually runs a day or two depending on size and whether there's a hot tub or built-in bench to remove first.

Multi-Level Deck Construction

Sloped backyards usually call for a deck that steps down in stages instead of one tall platform with a single staircase. Each level needs its own beam and footing layout, and the stairs between them have to meet the same rise-and-run code as any other staircase. These jobs take longer than a single-level deck, mostly because of the extra footings and framing connections.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Wheeling, IL

These are the towns where we pull permits and pour footings regularly.

Wheeling, IL
Schaumburg, IL
Arlington Heights, IL
Palatine, IL
Des Plaines, IL
Mount Prospect, IL
Glenview, IL
Buffalo Grove, IL
Northbrook, IL
Elk Grove Village, IL
Libertyville, IL
Common Questions

Things worth asking

Questions that come up once a project actually gets started.

Is a permit required to build a deck in the Wheeling area?
Most villages in the Chicago suburbs require a building permit for any deck more than 30 inches off grade, and some require one regardless of height. The permit covers footing depth, railing height, and stair dimensions, and it gets pulled before construction starts, not after.
How long does a typical deck build take?
A single-level deck around 300 to 400 square feet usually takes one to two weeks from the first footing to the final board, weather permitting. Multi-level decks, screened sections, or jobs with extensive built-in seating can run three to four weeks.
Can a deck be built to a specific budget?
A budget can be worked to by adjusting decking material, square footage, and railing style rather than cutting corners on footings or framing. Pressure-treated lumber with a simple rail design keeps costs down, while composite boards and metal or cable railing push the total up.
What kind of guarantee comes with a new deck?
Workmanship is backed for a set period after completion, with the specifics written into the quote before work starts. Lumber and composite decking also carry manufacturer warranties, typically 15 to 25 years for composite against fading and staining.
Who handles questions and changes during the build?
One point of contact handles scheduling, material questions, and any changes that come up during the build, so there's no runaround between different people. That same person is reachable by phone throughout the job, not just at the quote stage.
What materials are typically used for decking and framing?
Framing is pressure-treated pine with joist hangers and hot-dip galvanized or stainless steel fasteners, since the wrong hardware corrodes fast against treated lumber chemicals. Decking boards are either pressure-treated, cedar, or composite, chosen based on budget and how much upkeep the homeowner wants to do.
Can the yard still be used while the deck is under construction?
Most of the yard stays usable during construction, though the immediate work area around the deck footprint has to stay clear for safety and material staging. Driveways or a section of lawn are sometimes used for lumber delivery and cutting.
What should be done to prepare the site before a build starts?
Clearing furniture, planters, grills, and anything else off the existing deck or build area makes the first day go faster. Trimming back bushes or tree branches near the work zone helps too, since excavation equipment and lumber require room to maneuver.
What happens if rot or damage turns up once an old deck is torn out?
Hidden rot in the ledger board, rim joist, or house framing behind a deck sometimes shows up once the old structure is removed, and that gets flagged immediately with photos before any new lumber goes up. Repair cost for that additional work is quoted separately rather than buried in the original price.
How should a finished deck be maintained?
Wood decks call for re-staining every two to three years depending on sun exposure, with the old finish stripped first so the new coat actually bonds. Composite decking just needs an occasional wash with soap and water, since it doesn't absorb moisture or require sealing.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (847) 242-2308